
GR-FCV-CFG Vacuum Motor
Replacement vacuum motor for compatible floor scrubbers; voltage, airflow interface, mounting, and machine model must be confirmed.
Specifications
| Product Type | Floor scrubber vacuum motor |
|---|---|
| Motor Configuration | Tangential discharge vacuum motor |
| Selection Inputs | Machine model, voltage, motor label, stages, discharge, and mounting |
| Compatibility | Confirm connector, gasket, cooling, dimensions, and control system |
Free technical consultation · Industrial quality guaranteed · Worldwide shipping
Shipping & warranty
Shipping & delivery
Equipment and accessories can be shipped internationally. Freight, lead time, customs responsibility, and delivery access are confirmed for the destination and final order configuration.
Read the shipping policy →Limited warranty
Warranty eligibility is governed by the accepted quotation and applicable manufacturer terms. Consumables, normal wear items, and components depleted or degraded through ordinary use are not covered.
Read the complete warranty policy →Built for the work.
The GR-FCV-CFG is a replacement vacuum motor for compatible commercial floor scrubbers. The motor creates the airflow and suction used to recover dirty water from the squeegee assembly into the recovery tank. The supplied image shows a tangential-discharge motor configuration.
Vacuum motors with a similar diameter can differ in voltage, number of stages, fan and discharge arrangement, mounting flange, gasket, overall height, electrical connector, cooling path, and control method. Send the floor-scrubber brand and model, the complete motor label, dimensions, connector photographs, and the existing part reference before ordering.
Where it performs.
- Replacement of a failed floor-scrubber recovery vacuum motor
- Restoring suction after the hose, tank, seals, and squeegee have been checked
- Maintenance sourcing after voltage and mounting confirmation
What’s included.
- Final scope of supply confirmed in the accepted quotation
Specify before delivery.
Confirm utilities, site access, operating environment, consumables, ventilation, PPE, delivery handling, and local requirements before finalizing the configuration.
Discuss your application →Related guidance




